![]() Expanding the existing desalination plant to treat additional seawater.Expanding the regional surface water treatment plant to treat additional water from the Tampa Bypass Canal, Alafia River and C.W.The three top-ranked new water supply projects in the Master Water Plan are: Studying three potential new projects to refine cost, yield and permittability. ![]() Optimizing the existing surface water treatment plant and desalination plant to gain 5-10 million gallons per day of additional supply.Conserving up to 11 million gallons per day through regional demand management.To meet the region’s water needs, the Long-term Master Water Plan includes: Our long-term planning process includes analyses of future demand, conservation potential, supply reliability, water shortage mitigation planning and hydrologic uncertainty – all wrapped up in the Long-term Master Water Plan planning process. Planning for the region’s water needs is an on-going process at Tampa Bay Water and includes more than building new supplies.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |